Ski resorts Central Asia
Combined lifts Central Asia
All combined lifts at ski resorts in Central Asia (CGD in Central Asia)
Description combined lift (Telemix)
This innovative ropeway system combines the advantages of a detachable gondola lift with those of a detachable chairlift. Gondolas and chairs are used simultaneously, whereby the boarding and exiting areas are separate and the requirements of the individual lift types are met.
Combined lifts/Telemix in Central Asia
Add lifts and cable cars? Please report here
Central Asia: combined lifts (chair/gondola) (2)
- Central Asia – limit to
Countries:
Mountain range:
1-1 out of 1 ski resorts
Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1875 m
Carrying capacity/hour: 1900
Manufacturer: LEITNER
Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1163 m
Carrying capacity/hour: 1900
Manufacturer: LEITNER
1-1 out of 1 ski resorts