Ski resorts Central Eastern Alps
Change lift info:
Central Eastern Alps: new lifts 2020/2021
All new lifts in the Central Eastern Alps for the 2020/2021 season
Overview: new ski lifts in the Central Eastern Alps 2020/2021
New lifts at ski resorts in the Central Eastern Alps : renewal of ski lifts or ski resort expansions in the Central Eastern Alps
Total: 18
5 1 5 3 2 2
Add lifts and cable cars? Please report here
Central Eastern Alps: new ski lifts 2020/2021
- Central Eastern Alps – limit to
Mountain ranges:
Central Eastern Alps – switch toStates AT:
Canton CH:
Region IT:
1-17 out of 17 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
J-bar
Length: 488 m
Carrying capacity/hour: 720
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
Rope tow/baby lift with low rope tow
People mover/Moving Carpet
Length: 75 m
Carrying capacity/hour: 1000
Manufacturer: Sunkid
Combined installation (6 pers. chair and 10 pers. gondola)
8pers. High speed chairlift (detachable) with bubble and seat heating
8pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable) with bubble and seat heating
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 864 m
Carrying capacity/hour: 2300
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
People mover/Moving Carpet
Rope tow/baby lift with low rope tow
Length: 95 m
Carrying capacity/hour: 360
T-bar
Length: 1162 m
Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
J-bar
Length: 488 m
Carrying capacity/hour: 720
Manufacturer: LEITNER
People mover/Moving Carpet
Length: 75 m
Carrying capacity/hour: 1000
Manufacturer: Sunkid
J-bar
Length: 224 m
Carrying capacity/hour: 652
Manufacturer: Doppelmayr
1-17 out of 17 ski resorts