Ski resorts East Asia
East Asia: new lifts 2017/2018
All new lifts in East Asia for the 2017/2018 season
Overview: new ski lifts in East Asia 2017/2018
New lifts at ski resorts in East Asia : renewal of ski lifts or ski resort expansions in East Asia
Total: 14
2 2 10
Add lifts and cable cars? Please report here
East Asia: new ski lifts 2017/2018
- East Asia – limit to
Countries:
Mountain ranges:
1-11 out of 11 ski resorts
4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
2pers. Chairlift (fixed-grip)
Length: 100 m
Carrying capacity/hour: 900
Manufacturer: Nippon Cable
8pers. Gondola lift (monocable circulating ropeway)
Length: 1949 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1459 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable)
Length: 449 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Combined installation (6 pers. chair and 8 pers. gondola)
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 955 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1200 m
Carrying capacity/hour: 3000
Manufacturer: Bartholet BMF
8pers. Gondola lift (monocable circulating ropeway)
Length: 941 m
Carrying capacity/hour: 1300
Manufacturer: Bartholet BMF
2pers. Chairlift (fixed-grip)
Length: 100 m
Carrying capacity/hour: 900
Manufacturer: Nippon Cable
3pers. Chairlift (fixed-grip)
Length: 698 m
Carrying capacity/hour: 1500
2pers. Chairlift (fixed-grip)
Length: 758 m
Carrying capacity/hour: 1200
2pers. Chairlift (fixed-grip)
Length: 480 m
Carrying capacity/hour: 1000
2pers. Chairlift (fixed-grip)
Length: 400 m
Carrying capacity/hour: 1000
1-11 out of 11 ski resorts