Ski resorts East Coast
East Coast: new lifts 2021/2022
All new lifts on the East Coast for the 2021/2022 season
Overview: new ski lifts on the East Coast 2021/2022
New lifts at ski resorts on the East Coast : renewal of ski lifts or ski resort expansions on the East Coast
Total: 16
12 2 1 1
Add lifts and cable cars? Please report here
East Coast: new ski lifts 2021/2022
- East Coast – limit to
States:
East Coast – switch toAreas:
Mountain ranges:
1-14 out of 14 ski resorts
3pers. Chairlift (fixed-grip)
4pers. Chairlift (fixed-grip)
Length: 550 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
6pers. High speed chairlift (detachable)
Length: 1248 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable) with bubble
Length: 1253 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
8pers. High speed chairlift (detachable) with bubble and seat heating
4pers. High speed chairlift (detachable)
Length: 495 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
T-bar
Length: 769 m
Carrying capacity/hour: 1198
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 623 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 1524 m
Carrying capacity/hour: 2000
Manufacturer: Poma
4pers. Chairlift (fixed-grip)
Length: 147 m
Carrying capacity/hour: 2000
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 596 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 548 m
Carrying capacity/hour: 2400
Manufacturer: CTEC
4pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 2000
Manufacturer: Poma
Rope tow/baby lift with low rope tow
Length: 130 m
Carrying capacity/hour: 600
Manufacturer: Sunkid
People mover/Moving Carpet
Length: 48 m
Carrying capacity/hour: 1200
Manufacturer: Sunkid
1-14 out of 14 ski resorts