Ski resorts Italy
Change lift info:
Italy: new lifts 2024/2025
All new lifts in Italy (Italia) for the 2024/2025 season
Overview: new ski lifts in Italy (Italia) 2024/2025
New lifts at ski resorts in Italy (Italia) : renewal of ski lifts or ski resort expansions in Italy (Italia)
Total: 22
4 16 2
Add lifts and cable cars? Please report here
Italy: new ski lifts 2024/2025
- Italy – limit to
Regions:
Areas:
Mountain ranges:
Other:
1-19 out of 19 ski resorts
6pers. High speed chairlift (detachable) with bubble
6pers. High speed chairlift (detachable) with bubble and seat heating
8pers. High speed chairlift (detachable) with bubble
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
Length: 977 m
Carrying capacity/hour: 2200
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1470 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
10pers. Gondola lift with seat heating (monocable circulating ropeway)
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1633 m
Carrying capacity/hour: 3200
4pers. Chairlift (fixed-grip)
Length: 251 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with seat heating
Length: 1200 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
Length: 746 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
Length: 563 m
Carrying capacity/hour: 2400
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
2pers. Chairlift (fixed-grip)
Length: 1577 m
Carrying capacity/hour: 1200
8pers. Gondola lift (monocable circulating ropeway)
Length: 1440 m
Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
4pers. Chairlift (fixed-grip)
Length: 709 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
4pers. High speed chairlift (detachable)
Length: 990 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable)
Length: 930 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
1-19 out of 19 ski resorts