Ski resorts Northern French Alps (Alpes du Nord)
Northern French Alps (Alpes du Nord): new lifts 2018/2019
All new lifts in the Northern French Alps (Alpes du Nord) for the 2018/2019 season
Overview: new ski lifts in the Northern French Alps (Alpes du Nord) 2018/2019
New lifts at ski resorts in the Northern French Alps (Alpes du Nord) : renewal of ski lifts or ski resort expansions in the Northern French Alps (Alpes du Nord)
Total: 30
1 7 1 13 6 1 1
Add lifts and cable cars? Please report here
Northern French Alps (Alpes du Nord): new ski lifts 2018/2019
- Northern French Alps (Alpes du Nord) – switch to
Departments:
Mountain ranges:
Parks:
1-17 out of 17 ski resorts
100pers. Aerial tramway/Reversible ropeway
10pers. Gondola lift with seat heating (monocable circulating ropeway)
8pers. Gondola lift (monocable circulating ropeway)
Length: 902 m
Carrying capacity/hour: 2400
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 1208 m
Carrying capacity/hour: 2824
Manufacturer: Poma
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
Length: 1928 m
Carrying capacity/hour: 3600
Manufacturer: Poma
6pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
Length: 550 m
Carrying capacity/hour: 1800
Manufacturer: CCM Finotello
10pers. Gondola lift (monocable circulating ropeway)
4pers. High speed chairlift (detachable)
Length: 1623 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
Length: 876 m
Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
6pers. High speed chairlift (detachable)
Length: 1648 m
Carrying capacity/hour: 2800
Manufacturer: Bartholet BMF
10pers. Gondola lift with seat heating (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
Length: 1602 m
Carrying capacity/hour: 2400
Manufacturer: Poma
Rope tow/baby lift with low rope tow
Length: 273 m
Carrying capacity/hour: 1500
Manufacturer: GMM Gimar Montaz Mautino
6pers. High speed chairlift (detachable)
Length: 959 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
J-bar
Length: 108 m
Carrying capacity/hour: 770
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 1026 m
Carrying capacity/hour: 2000
Manufacturer: GMM Gimar Montaz Mautino
Combined installation (6 pers. chair and 10 pers. gondola)
1-17 out of 17 ski resorts