Ski resorts Pontic Mountains
Change lift info:
Pontic Mountains: new lifts 2014/2015
All new lifts in the Pontic Mountains for the 2014/2015 season
Overview: new ski lifts in the Pontic Mountains 2014/2015
New lifts at ski resorts in the Pontic Mountains : renewal of ski lifts or ski resort expansions in the Pontic Mountains
Total: 6
5 1
Add lifts and cable cars? Please report here
Pontic Mountains: new ski lifts 2014/2015
- Pontic Mountains – limit to
Mountain ranges:
Mountain ranges:
Pontic Mountains – switch toRegion:
Region:
1-4 out of 4 ski resorts
4pers. Chairlift (fixed-grip)
Length: 692 m
Carrying capacity/hour: 1200
Manufacturer: MND Ropeways
6pers. High speed chairlift (detachable) with bubble
Length: 1974 m
Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable) with bubble
Length: 2226 m
Carrying capacity/hour: 1186
Manufacturer: LEITNER
4pers. High speed chairlift (detachable) with bubble
Length: 1636 m
Carrying capacity/hour: 1002
Manufacturer: LEITNER
4pers. High speed chairlift (detachable) with bubble
Length: 892 m
Carrying capacity/hour: 1498
Manufacturer: LEITNER
1-4 out of 4 ski resorts