Ski resorts Pontic Mountains
Change lift info:
Pontic Mountains: new lifts 2016/2017
All new lifts in the Pontic Mountains for the 2016/2017 season
Overview: new ski lifts in the Pontic Mountains 2016/2017
New lifts at ski resorts in the Pontic Mountains : renewal of ski lifts or ski resort expansions in the Pontic Mountains
Total: 3
3
Add lifts and cable cars? Please report here
Pontic Mountains: new ski lifts 2016/2017
- Pontic Mountains – limit to
Mountain ranges:
Mountain ranges:
Pontic Mountains – switch toRegion:
Region:
1-2 out of 2 ski resorts
4pers. High speed chairlift (detachable) with bubble
Length: 1104 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
4pers. High speed chairlift (detachable) with bubble
Length: 1169 m
Carrying capacity/hour: 1500
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 873 m
Carrying capacity/hour: 1200
Manufacturer: MND Ropeways
1-2 out of 2 ski resorts