Ski resorts Rocky Mountains
Change lift info:
Rocky Mountains: new lifts 2024/2025
All new lifts in the Rocky Mountains for the 2024/2025 season
Overview: new ski lifts in the Rocky Mountains 2024/2025
New lifts at ski resorts in the Rocky Mountains : renewal of ski lifts or ski resort expansions in the Rocky Mountains
Total: 26
2 22 1 1
Add lifts and cable cars? Please report here
Rocky Mountains: new ski lifts 2024/2025
- Rocky Mountains – limit to
Mountain ranges:
Rocky Mountains – switch toCountries:
Provinces CAN:
States US:
1-16 out of 16 ski resorts
4pers. High speed chairlift (detachable)
Length: 1541 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
6pers. High speed chairlift (detachable) with bubble
4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
6pers. High speed chairlift (detachable) with bubble and seat heating
4pers. Chairlift (fixed-grip)
Length: 600 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1590 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
8pers. Gondola lift (monocable circulating ropeway)
Length: 1036 m
Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
8pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 1501 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
Length: 1252 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
Length: 1759 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 1158 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 250 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. Chairlift (fixed-grip)
Length: 800 m
Carrying capacity/hour: 2400
Manufacturer: Skytrac Inc.
4pers. High speed chairlift (detachable)
Length: 1220 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
3pers. Chairlift (fixed-grip)
8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Manufacturer: Doppelmayr
J-bar
Length: 268 m
Carrying capacity/hour: 700
Manufacturer: Leitner-Poma
Rope tow/baby lift with low rope tow
Carrying capacity/hour: 500
1-16 out of 16 ski resorts