Ski resorts Rocky Mountains
Change lift info:
Rocky Mountains: new lifts 2017/2018
All new lifts in the Rocky Mountains for the 2017/2018 season
Overview: new ski lifts in the Rocky Mountains 2017/2018
New lifts at ski resorts in the Rocky Mountains : renewal of ski lifts or ski resort expansions in the Rocky Mountains
Total: 18
2 13 1 2
Add lifts and cable cars? Please report here
Rocky Mountains: new ski lifts 2017/2018
- Rocky Mountains – limit to
Mountain ranges:
Rocky Mountains – switch toCountries:
Provinces CAN:
States US:
1-13 out of 13 ski resorts
6pers. High speed chairlift (detachable)
Length: 1800 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
Length: 1368 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1780 m
Carrying capacity/hour: 3000
Manufacturer: Poma
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
Length: 890 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
8pers. Gondola lift (monocable circulating ropeway)
Length: 1928 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable) with bubble
Length: 1432 m
Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
3pers. Chairlift (fixed-grip)
Length: 774 m
Carrying capacity/hour: 1785
Manufacturer: Doppelmayr
Rope tow/baby lift with low rope tow
Length: 114 m
Carrying capacity/hour: 500
6pers. Pulsed-movement aerial ropeway (gondola)
Length: 234 m
Carrying capacity/hour: 400
Manufacturer: Leitner-Poma
3pers. Chairlift (fixed-grip)
Length: 296 m
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
3pers. Chairlift (fixed-grip)
Length: 872 m
Carrying capacity/hour: 1600
Manufacturer: CTEC
3pers. Chairlift (fixed-grip)
Length: 1180 m
Carrying capacity/hour: 1800
Manufacturer: Skytrac Inc.
People mover/Moving Carpet with cover
Length: 33 m
Carrying capacity/hour: 1800
Manufacturer: Sunkid
People mover/Moving Carpet with cover
Length: 93 m
Carrying capacity/hour: 1800
Manufacturer: Sunkid
6pers. High speed chairlift (detachable)
Length: 1214 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
1-13 out of 13 ski resorts