Ski resorts Savoie Mont Blanc
Savoie Mont Blanc: new lifts 2014/2015
All new lifts in Savoie Mont Blanc for the 2014/2015 season
Overview: new ski lifts in Savoie Mont Blanc 2014/2015
New lifts at ski resorts in Savoie Mont Blanc : renewal of ski lifts or ski resort expansions in Savoie Mont Blanc
Total: 25
2 1 15 7
Add lifts and cable cars? Please report here
Savoie Mont Blanc: new ski lifts 2014/2015
- Savoie Mont Blanc – limit to
Tourism regions:
Departments:
Districts:
Savoie Mont Blanc – switch toMountain ranges:
Parks:
1-11 out of 11 ski resorts
6pers. High speed chairlift (detachable) with bubble
Length: 1609 m
Carrying capacity/hour: 2400
Manufacturer: Poma
6pers. High speed chairlift (detachable)
Length: 1259 m
Carrying capacity/hour: 3300
Manufacturer: Poma
6pers. High speed chairlift (detachable)
Length: 1796 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1862 m
Carrying capacity/hour: 2600
Manufacturer: Poma
4pers. High speed chairlift (detachable)
Length: 1489 m
Carrying capacity/hour: 2000
Manufacturer: Poma
8pers. High speed chairlift (detachable)
Length: 1546 m
Carrying capacity/hour: 4400
Manufacturer: Poma
J-bar
Length: 386 m
Carrying capacity/hour: 850
Manufacturer: Doppelmayr
J-bar
Length: 200 m
Carrying capacity/hour: 720
Manufacturer: MND Ropeways
J-bar
Length: 265 m
Carrying capacity/hour: 888
Manufacturer: MND Ropeways
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
8pers. Gondola lift (monocable circulating ropeway)
Length: 573 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
J-bar
Length: 357 m
Carrying capacity/hour: 900
Manufacturer: GMM Gimar Montaz Mautino
6pers. High speed chairlift (detachable)
Length: 1266 m
Carrying capacity/hour: 2700
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1741 m
Carrying capacity/hour: 2800
Manufacturer: Poma
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1566 m
Carrying capacity/hour: 2525
Manufacturer: Poma
4pers. Chairlift (fixed-grip)
Length: 336 m
Carrying capacity/hour: 2000
Manufacturer: Poma
J-bar
Length: 102 m
Carrying capacity/hour: 878
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
3pers. Chairlift (fixed-grip)
Length: 1378 m
Carrying capacity/hour: 1500
Manufacturer: Poma
1-11 out of 11 ski resorts