Ski resorts South Eastern Alps
South Eastern Alps: new lifts 2023/2024
All new lifts in the South Eastern Alps for the 2023/2024 season
Overview: new ski lifts in the South Eastern Alps 2023/2024
New lifts at ski resorts in the South Eastern Alps : renewal of ski lifts or ski resort expansions in the South Eastern Alps
Total: 30
1 4 14 6 5
Add lifts and cable cars? Please report here
South Eastern Alps: new ski lifts 2023/2024
- South Eastern Alps – limit to
Mountain ranges:
South Eastern Alps – switch toStates:
Regions:
Regions:
1-22 out of 22 ski resorts
4pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
Length: 1650 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
People mover/Moving Carpet with cover
Length: 150 m
Carrying capacity/hour: 1000
Manufacturer: Sunkid
People mover
Length: 189 m
Carrying capacity/hour: 1500
Manufacturer: Fava srl
10pers. Gondola lift (monocable circulating ropeway)
Length: 414 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
People mover/Moving Carpet
Length: 104 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
People mover/Moving Carpet
Length: 80 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
4pers. Chairlift (fixed-grip)
Length: 546 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
J-bar
Length: 451 m
Carrying capacity/hour: 898
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 873 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
Length: 1124 m
Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1343 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 1285 m
Carrying capacity/hour: 2020
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble and seat heating
4pers. Chairlift (fixed-grip)
Length: 731 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 671 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
J-bar
Length: 320 m
Carrying capacity/hour: 890
Manufacturer: LEITNER
40pers. Aerial tramway/Reversible ropeway
4pers. Chairlift (fixed-grip)
Length: 660 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 405 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1341 m
Carrying capacity/hour: 1460
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 1447 m
Carrying capacity/hour: 1200
4pers. Chairlift (fixed-grip)
Length: 825 m
Carrying capacity/hour: 2000
Manufacturer: MND Ropeways
1-22 out of 22 ski resorts