Ski resorts South Tyrol (Südtirol)
South Tyrol (Südtirol): new lifts 2024/2025
All new lifts in South Tyrol (Südtirol) for the 2024/2025 season
Overview: new ski lifts in South Tyrol (Südtirol) 2024/2025
New lifts at ski resorts in South Tyrol (Südtirol) : renewal of ski lifts or ski resort expansions in South Tyrol (Südtirol)
Total: 9
5 3 1
Add lifts and cable cars? Please report here
South Tyrol (Südtirol): new ski lifts 2024/2025
- South Tyrol (Südtirol) – limit to
Tourism regions:
South Tyrol (Südtirol) – switch toMountain ranges:
Valleys:
Other:
1-8 out of 8 ski resorts
6pers. High speed chairlift (detachable) with bubble and seat heating
8pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable) with bubble
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 1200 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
J-bar
Length: 626 m
Carrying capacity/hour: 800
Manufacturer: LEITNER
1-8 out of 8 ski resorts