Ski resorts Southern Europe
Change lift info:
Southern Europe: new lifts 2021/2022
All new lifts in Southern Europe for the 2021/2022 season
Overview: new ski lifts in Southern Europe 2021/2022
New lifts at ski resorts in Southern Europe : renewal of ski lifts or ski resort expansions in Southern Europe
Total: 33
1 7 10 12 1 2
Add lifts and cable cars? Please report here
Southern Europe: new ski lifts 2021/2022
- Southern Europe – limit to
Countries:
1-26 out of 26 ski resorts
60pers. Aerial tramway/Reversible ropeway
J-bar
8pers. High speed chairlift (detachable) with bubble and seat heating
J-bar
Length: 721 m
Carrying capacity/hour: 720
Manufacturer: CCM Finotello
6pers. High speed chairlift (detachable)
Length: 1996 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
J-bar
Length: 337 m
Carrying capacity/hour: 650
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
4pers. Chairlift (fixed-grip)
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
Length: 1442 m
Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
Rope tow/baby lift with low rope tow
People mover/Moving Carpet
6pers. High speed chairlift (detachable) with seat heating
10pers. Gondola lift (monocable circulating ropeway)
Length: 738 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
2pers. Chairlift (fixed-grip)
Length: 908 m
Carrying capacity/hour: 1200
T-bar
4pers. Chairlift (fixed-grip)
Length: 257 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
People mover/Moving Carpet with cover
Length: 200 m
Carrying capacity/hour: 1800
Manufacturer: Sunkid
10pers. Gondola lift (monocable circulating ropeway)
Length: 5017 m
Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
6pers. Gondola lift (monocable circulating ropeway)
Length: 1953 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
J-bar
Length: 395 m
Carrying capacity/hour: 720
Manufacturer: LEITNER
1-26 out of 26 ski resorts