Ski resorts Trentino-Alto Adige (Trentino-Südtirol)
Change lift info:
Trentino-Alto Adige (Trentino-Südtirol): new lifts 2018/2019
All new lifts in Trentino-Alto Adige (Trentino-Südtirol) for the 2018/2019 season
Overview: new ski lifts in Trentino-Alto Adige (Trentino-Südtirol) 2018/2019
New lifts at ski resorts in Trentino-Alto Adige (Trentino-Südtirol) : renewal of ski lifts or ski resort expansions in Trentino-Alto Adige (Trentino-Südtirol)
Total: 18
6 1 7 2 2
Add lifts and cable cars? Please report here
Trentino-Alto Adige (Trentino-Südtirol): new ski lifts 2018/2019
- Trentino-Alto Adige (Trentino-Südtirol) – limit to
Tourism regions:
Provinces:
Trentino-Alto Adige (Trentino-Südtirol) – switch toMountain ranges:
Park:
Other:
1-17 out of 17 ski resorts
6pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
12pers. Gondola lift (monocable circulating ropeway)
Length: 396 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Length: 1492 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
10pers. Gondola lift with seat heating (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 542 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
J-bar
Length: 353 m
Carrying capacity/hour: 900
Manufacturer: LEITNER
People mover/Moving Carpet
Combined installation (6 pers. chair and 8 pers. gondola)
4pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable) with bubble
People mover/Moving Carpet
Length: 120 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
1-17 out of 17 ski resorts