Ski resorts USA
USA: new lifts 2017/2018
All new lifts in the United States of America for the 2017/2018 season
Overview: new ski lifts in the United States of America 2017/2018
New lifts at ski resorts in the United States of America : renewal of ski lifts or ski resort expansions in the United States of America
Total: 41
1 3 27 3 2 5
Add lifts and cable cars? Please report here
USA: new ski lifts 2017/2018
- USA – limit to
States:
Areas:
USA – switch toMountain ranges:
1-33 out of 33 ski resorts
6pers. High speed chairlift (detachable)
Length: 1800 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
Length: 1368 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1780 m
Carrying capacity/hour: 3000
Manufacturer: Poma
6pers. High speed chairlift (detachable)
3pers. Chairlift (fixed-grip)
6pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)
Length: 890 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
8pers. Gondola lift (monocable circulating ropeway)
Length: 1928 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable) with bubble
Length: 1432 m
Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
3pers. Chairlift (fixed-grip)
Length: 774 m
Carrying capacity/hour: 1785
Manufacturer: Doppelmayr
Rope tow/baby lift with low rope tow
Length: 114 m
Carrying capacity/hour: 500
4pers. Chairlift (fixed-grip)
6pers. Pulsed-movement aerial ropeway (gondola)
Length: 234 m
Carrying capacity/hour: 400
Manufacturer: Leitner-Poma
3pers. Chairlift (fixed-grip)
Length: 296 m
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
3pers. Chairlift (fixed-grip)
Length: 872 m
Carrying capacity/hour: 1600
Manufacturer: CTEC
4pers. Chairlift (fixed-grip)
Length: 530 m
Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 638 m
Carrying capacity/hour: 1140
Manufacturer: Doppelmayr
45pers. Aerial tramway/Reversible ropeway
Length: 2371 m
Carrying capacity/hour: 370
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 945 m
Carrying capacity/hour: 3000
Manufacturer: Leitner-Poma
People mover/Moving Carpet with cover
Length: 144 m
Carrying capacity/hour: 1000
Manufacturer: Sunkid
People mover/Moving Carpet with cover
Length: 144 m
Carrying capacity/hour: 1000
Manufacturer: Sunkid
3pers. Chairlift (fixed-grip)
Length: 1180 m
Carrying capacity/hour: 1800
Manufacturer: Skytrac Inc.
People mover/Moving Carpet with cover
Length: 33 m
Carrying capacity/hour: 1800
Manufacturer: Sunkid
People mover/Moving Carpet with cover
Length: 93 m
Carrying capacity/hour: 1800
Manufacturer: Sunkid
3pers. Chairlift (fixed-grip)
Length: 615 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 789 m
Carrying capacity/hour: 2380
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 1214 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 848 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Length: 1432 m
Carrying capacity/hour: 2600
Manufacturer: Leitner-Poma
3pers. Chairlift (fixed-grip)
Length: 856 m
Carrying capacity/hour: 1600
Manufacturer: CTEC
8pers. Gondola lift (monocable circulating ropeway)
4pers. High speed chairlift (detachable)
Length: 659 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 555 m
Carrying capacity/hour: 2400
3pers. Chairlift (fixed-grip)
Length: 620 m
Carrying capacity/hour: 1800
Manufacturer: Riblet
T-bar
Length: 244 m
Carrying capacity/hour: 800
Manufacturer: Hall
Rope tow/baby lift with low rope tow
Length: 100 m
Carrying capacity/hour: 500
People mover/Moving Carpet
Length: 60 m
Carrying capacity/hour: 1500
Manufacturer: Sunkid
4pers. Chairlift (fixed-grip)
Length: 380 m
Carrying capacity/hour: 2400
Manufacturer: Partek
1-33 out of 33 ski resorts