Ski resorts Western Alps
Change lift info:
Western Alps: new lifts 2018/2019
All new lifts in the Western Alps for the 2018/2019 season
Overview: new ski lifts in the Western Alps 2018/2019
New lifts at ski resorts in the Western Alps : renewal of ski lifts or ski resort expansions in the Western Alps
Total: 53
4 13 1 21 11 1 2
Add lifts and cable cars? Please report here
Western Alps: new ski lifts 2018/2019
- Western Alps – limit to
Mountain ranges:
Western Alps – switch toCountries:
1-37 out of 37 ski resorts
J-bar
100pers. Aerial tramway/Reversible ropeway
10pers. Gondola lift with seat heating (monocable circulating ropeway)
8pers. Gondola lift (monocable circulating ropeway)
Length: 902 m
Carrying capacity/hour: 2400
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble and seat heating
6pers. High speed chairlift (detachable)
Length: 1208 m
Carrying capacity/hour: 2824
Manufacturer: Poma
28pers. Tricable ropeway
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
Length: 1928 m
Carrying capacity/hour: 3600
Manufacturer: Poma
J-bar
Length: 235 m
Carrying capacity/hour: 619
Manufacturer: Doppelmayr
8pers. High speed chairlift (detachable)
Length: 1100 m
Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
Length: 550 m
Carrying capacity/hour: 1800
Manufacturer: CCM Finotello
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
4pers. High speed chairlift (detachable)
Length: 1623 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
8pers. Gondola lift (monocable circulating ropeway)
Length: 1121 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
T-bar
Length: 656 m
Carrying capacity/hour: 912
Manufacturer: Doppelmayr
T-bar
Length: 656 m
Carrying capacity/hour: 912
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
10pers. Gondola lift (monocable circulating ropeway)
10pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
Length: 876 m
Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
6pers. High speed chairlift (detachable)
Length: 1648 m
Carrying capacity/hour: 2800
Manufacturer: Bartholet BMF
10pers. Gondola lift with seat heating (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
Length: 1602 m
Carrying capacity/hour: 2400
Manufacturer: Poma
Rope tow/baby lift with low rope tow
Length: 273 m
Carrying capacity/hour: 1500
Manufacturer: GMM Gimar Montaz Mautino
People mover/Moving Carpet with cover
Length: 165 m
Carrying capacity/hour: 1600
Manufacturer: Sunkid
6pers. High speed chairlift (detachable)
Length: 1863 m
Carrying capacity/hour: 3000
Manufacturer: Poma
6pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
Length: 1345 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 2318 m
Carrying capacity/hour: 2500
Manufacturer: Poma
6pers. High speed chairlift (detachable)
Length: 959 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
J-bar
Length: 108 m
Carrying capacity/hour: 770
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
Length: 2253 m
Carrying capacity/hour: 2835
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable)
Length: 1936 m
Carrying capacity/hour: 1600
Manufacturer: Garaventa
T-bar
Length: 365 m
Carrying capacity/hour: 720
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 1064 m
Carrying capacity/hour: 1800
Manufacturer: GMM Gimar Montaz Mautino
4pers. Chairlift (fixed-grip)
Length: 1026 m
Carrying capacity/hour: 2000
Manufacturer: GMM Gimar Montaz Mautino
Combined installation (6 pers. chair and 10 pers. gondola)
25pers. Aerial tramway/Reversible ropeway
Length: 1583 m
Carrying capacity/hour: 230
Manufacturer: Steurer
25pers. Aerial tramway/Reversible ropeway
Length: 1158 m
Carrying capacity/hour: 200
Manufacturer: Steurer
15pers. Aerial tramway/Reversible ropeway
Length: 2178 m
Carrying capacity/hour: 112
Manufacturer: Garaventa
1-37 out of 37 ski resorts