Ski resorts Ankogel Group
Change lift info:
Ankogel Group: planned lifts
All planned lifts in the Ankogel Group
Overview: planned ski lifts in the Ankogel Group
Lift projects at ski resorts in the Ankogel Group (renewal, development and integration)
Total: 6
3 2 1
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Ankogel Group: planned ski lifts
- Ankogel Group – switch to
Tourism regions:
Valleys:
Districts:
1-3 out of 3 ski resorts
10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1660 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 2100 m
Carrying capacity/hour: 2400
1-3 out of 3 ski resorts