Ski resorts Glockner Group
Change lift info:
Glockner Group: planned lifts
All planned lifts in the Glockner Group
Overview: planned ski lifts in the Glockner Group
Lift projects at ski resorts in the Glockner Group (renewal, development and integration)
Total: 2
1 1
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Glockner Group: planned ski lifts
- Glockner Group – switch to
Tourism regions:
Valleys:
District:
1-2 out of 2 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m
Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1385 m
Carrying capacity/hour: 1800
1-2 out of 2 ski resorts