Ski resorts Great Dividing Range
Change lift info:
Great Dividing Range: planned lifts
All planned lifts in the Great Dividing Range
Overview: planned ski lifts in the Great Dividing Range
Lift projects at ski resorts in the Great Dividing Range (renewal, development and integration)
Total: 8
1 5 2
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Great Dividing Range: planned ski lifts
- Great Dividing Range – limit to
Mountain ranges:
Great Dividing Range – switch toStates:
National Parks:
1-4 out of 4 ski resorts
6pers. High speed chairlift (detachable)
Length: 1735 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 1680 m
Carrying capacity/hour: 3000
6pers. High speed chairlift (detachable)
Length: 1175 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 650 m
Carrying capacity/hour: 1800
4pers. Chairlift (fixed-grip)
Length: 400 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
1-4 out of 4 ski resorts