Ski resorts Lombardy
Lombardy: planned lifts
All planned lifts in Lombardy
Overview: planned ski lifts in Lombardy
Lift projects at ski resorts in Lombardy (renewal, development and integration)
Total: 15
1 5 1 8
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Lombardy: planned ski lifts
- Lombardy – limit to
Tourism region:
Provinces:
Valleys:
Lombardy – switch toMountain ranges:
Park:
1-8 out of 8 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Combined installation (6 pers. chair and 10 pers. gondola)
Length: 1508 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable)
Length: 1360 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 251 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
4pers. High speed chairlift (detachable) with bubble
Length: 1620 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
80pers. Aerial tramway/Reversible ropeway
Length: 2133 m
Carrying capacity/hour: 800
4pers. High speed chairlift (detachable) with bubble
Length: 1428 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 2146 m
Carrying capacity/hour: 3470
Manufacturer: Doppelmayr
12pers. Gondola lift (monocable circulating ropeway)
Length: 1933 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 2000
10pers. Gondola lift (monocable circulating ropeway)
Length: 1900 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
1-8 out of 8 ski resorts