Ski resorts Northern Europe
Change lift info:
Northern Europe: planned lifts
All planned lifts in Northern Europe
Overview: planned ski lifts in Northern Europe
Lift projects at ski resorts in Northern Europe (renewal, development and integration)
Total: 31
3 12 16
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Northern Europe: planned ski lifts
- Northern Europe – limit to
Countries:
1-19 out of 19 ski resorts
4pers. High speed chairlift (detachable)
8pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable) with bubble
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Length: 1090 m
Carrying capacity/hour: 2800
T-bar
Length: 1235 m
Carrying capacity/hour: 1000
Manufacturer: LEITNER
J-bar
Length: 850 m
Carrying capacity/hour: 500
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 600 m
Carrying capacity/hour: 2000
3pers. Chairlift (fixed-grip)
Length: 500 m
Carrying capacity/hour: 1000
10pers. Gondola lift (monocable circulating ropeway)
Length: 1350 m
Carrying capacity/hour: 1600
Manufacturer: Bartholet BMF
J-bar
Length: 780 m
Carrying capacity/hour: 806
Manufacturer: LEITNER
J-bar
Length: 386 m
Carrying capacity/hour: 764
Manufacturer: LEITNER
T-bar
Length: 1500 m
Carrying capacity/hour: 1250
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
6pers. High speed chairlift (detachable)
Length: 1850 m
Carrying capacity/hour: 2400
1-19 out of 19 ski resorts