Ski resorts Paznaun
Paznaun: planned lifts
All planned lifts in the Paznaun
Overview: planned ski lifts in the Paznaun
Lift projects at ski resorts in the Paznaun (renewal, development and integration)
Total: 6
3 3
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Paznaun: planned ski lifts
- Paznaun – switch to
Tourism region:
Mountain ranges:
1-3 out of 3 ski resorts
28pers. Tricable ropeway
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 3183 m
Carrying capacity/hour: 2000
Manufacturer: Garaventa
6pers. High speed chairlift (detachable) with bubble and seat heating
Carrying capacity/hour: 3000
6pers. High speed chairlift (detachable) with bubble and seat heating
Carrying capacity/hour: 3000
8pers. High speed chairlift (detachable)
Carrying capacity/hour: 3700
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
1-3 out of 3 ski resorts