Ski resorts Poland
Poland: planned lifts
All planned lifts in Poland (Polska)
Overview: planned ski lifts in Poland (Polska)
Lift projects at ski resorts in Poland (Polska) (renewal, development and integration)
Total: 6
4 2
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Poland: planned ski lifts
- Poland – limit to
Voivodeships:
Areas:
Mountain ranges:
1-4 out of 4 ski resorts
8pers. High speed chairlift (detachable) with bubble
Length: 842 m
Carrying capacity/hour: 3000
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Length: 1350 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 800 m
Carrying capacity/hour: 2000
t-bar lift/platter/button lift
Length: 820 m
Carrying capacity/hour: 2000
Manufacturer: Tatralift
4pers. Chairlift (fixed-grip)
Length: 650 m
Carrying capacity/hour: 2400
1-4 out of 4 ski resorts