Saint-Gotthard Massif: planned lifts
All planned lifts in the Saint-Gotthard Massif
Overview: planned ski lifts in the Saint-Gotthard Massif
Lift projects at ski resorts in the Saint-Gotthard Massif (renewal, development and integration)
Total: 3
1 2
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Saint-Gotthard Massif: planned ski lifts
- Saint-Gotthard Massif – switch to
Tourism regions:
Valleys:
Cantons:
1-1 out of 1 ski resorts
100pers. Aerial tramway/Reversible ropeway
Length: 2750 m
Carrying capacity/hour: 800
6pers. High speed chairlift (detachable) with bubble
Length: 920 m
Carrying capacity/hour: 2400
Manufacturer: Garaventa
6pers. High speed chairlift (detachable) with bubble
Length: 850 m
Carrying capacity/hour: 2400
Manufacturer: Garaventa
1-1 out of 1 ski resorts