Ski resorts Southeastern Europe (Balkans)
Change lift info:
Southeastern Europe (Balkans): planned lifts
All planned lifts in Southeastern Europe (Balkans)
Overview: planned ski lifts in Southeastern Europe (Balkans)
Lift projects at ski resorts in Southeastern Europe (Balkans) (renewal, development and integration)
Total: 26
7 1 16 2
Add lifts and cable cars? Please report here
See also:
New lifts 2024/2025
Southeastern Europe (Balkans): planned ski lifts
- Southeastern Europe (Balkans) – limit to
Countries:
1-17 out of 17 ski resorts
4pers. High speed chairlift (detachable)
Length: 2418 m
Carrying capacity/hour: 2000
Combined installation (6 pers. chair and 8 pers. gondola)
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 5369 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 1790 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 1500 m
Carrying capacity/hour: 2400
8pers. Gondola lift (monocable circulating ropeway)
Length: 3500 m
Carrying capacity/hour: 2000
2pers. Chairlift (fixed-grip)
Length: 620 m
Carrying capacity/hour: 1200
4pers. High speed chairlift (detachable)
Length: 3000 m
Carrying capacity/hour: 2000
10pers. Gondola lift (monocable circulating ropeway)
Length: 5369 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
4pers. High speed chairlift (detachable)
Length: 1000 m
Carrying capacity/hour: 1800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1830 m
Carrying capacity/hour: 2400
8pers. Gondola lift (monocable circulating ropeway)
Length: 1397 m
Carrying capacity/hour: 1000
Manufacturer: LEITNER
4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000
2pers. Chairlift (fixed-grip)
Length: 1900 m
Carrying capacity/hour: 1000
6pers. High speed chairlift (detachable)
Length: 1030 m
Carrying capacity/hour: 3000
8pers. Gondola lift (monocable circulating ropeway)
Length: 1600 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 1000 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 800 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 500 m
Carrying capacity/hour: 2400
8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
1-17 out of 17 ski resorts