Ski resorts Southern Poland
Southern Poland: planned lifts
All planned lifts in Southern Poland
Overview: planned ski lifts in Southern Poland
Lift projects at ski resorts in Southern Poland (renewal, development and integration)
Total: 5
3 2
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Southern Poland: planned ski lifts
- Southern Poland – limit to
Voivodeships:
Southern Poland – switch toMountain ranges:
1-3 out of 3 ski resorts
8pers. High speed chairlift (detachable) with bubble
Length: 842 m
Carrying capacity/hour: 3000
Manufacturer: LEITNER
6pers. High speed chairlift (detachable) with bubble
Length: 1350 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. Chairlift (fixed-grip)
Length: 800 m
Carrying capacity/hour: 2000
t-bar lift/platter/button lift
Length: 820 m
Carrying capacity/hour: 2000
Manufacturer: Tatralift
1-3 out of 3 ski resorts