Ski resorts France
Replaced by: Coolidge (YOC 2023) » People mover
Lift name
Coolidge 2
Status
lift closed and not replaced
Type
J-bar
Manufacturer
GMM Gimar Montaz Mautino
Ski resort
Year of construction
1976
Height/length
Base station 1630 m Top station 1672 m 42 m 265 m
Speed
2 metres per second
Transit time
approx. 2:30 minutes
Carrying capacity
600 people per hour
Towns/villages at the ski resort (distance from town center):
Les Deux Alpes (0.2 km), Les 2 Alpes 1800 (0.1 km), Alpe de Mont de Lans more Towns/villages at the ski resort more
Les Deux Alpes (0.2 km), Les 2 Alpes 1800 (0.1 km), Alpe de Mont de Lans more Towns/villages at the ski resort more
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
All lifts/cable cars at the ski resort Les 2 Alpes
Test Reports
Tips for the ski holiday