Italy
Select region
close
Continents
Countries
Regions
Tourism regions
Tourism regions

New at Madonna di Campiglio/​Pinzolo/​Folgàrida/​Marilleva

Planned project


Nube d'Argento


10pers. Gondola lift (monocable circulating ropeway)

Details here


Brenzi


6pers. High speed chairlift (detachable) with bubble

Details here


2024/2025


Ometto


6pers. High speed chairlift (detachable) with bubble

Details here


2023/2024


Prà Rodont-Doss del Sabion


10pers. Gondola lift (monocable circulating ropeway)

Details here


Gift wrap the SkiArea Campiglio, the best ski experience ever

"A SkiArea Campiglio Dolomiti di Brenta exclusive for the 2023/2024 winter season: StarGift, the open-dated gift card for that special someone that can’t wait for the very first snowfall to finally hit the slopes or to enjoy the best ski experience ever.
StarGift includes ski access to the SkiArea Campiglio Dolomiti di Brenta, MyPass Ski service and Helvetia Easy MyPass insurance that provides coverage for claims or injury to third parties which is now mandatory for all snow sports. "

2020/2021


Fortini Express


10pers. Gondola lift (monocable circulating ropeway)

Details here


A new jewel in the mountains: the Fortini - Pradalago gondola

The construction of this new 10-passenger lift with a carrying capacity of 3.600 passengers/hour and a speed of 6 meters/second along a 2.432-meter length with an elevation difference of 456 meters, is also the perfect opportunity to renovate both the area surrounding the base station of the lift and the parking area. The base station will be moved to the opposite side of the n. 239 state road, near the lift station that takes skiers up to the Grosté mountain.

2019/2020


Bassetta


6pers. High speed chairlift (detachable)

Details here


Nube d'Oro (Malga Montagnoli-Monte Spinale)


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


2018/2019


Fossadei-Malga Cioca


6pers. High speed chairlift (detachable)

Details here


Widening of slopes and improvement of snow-systems

During summer 2018, the ski area executed several construction works to improve the ski experience:
- Pradalago area: Widening of Amazzonia slope (n.57) and implementation of a new snow-making system. New snow-making system on Malga Zeledria-Campo Carlo Magno slope (n.54).
-5-Laghi area: New snow-making system in the first part pf the slope F.I.S.3-Tre.
- Spinale area: Widening of Spinale Diretta slope (n.73) in the track between Montagnoli Lake and the end of the slope served by a new a snow-making system.

2017/2018


Malghette


4pers. High speed chairlift (detachable) with bubble

Details here


2016/2017


Family Park Marilleva

New beginners’ and practice area with a people mover, snow playground and various fun features.

Family Park Daolasa

New beginners’ and practice area with several people movers, a playground and various fun features.

Restyling of the Malghette slope

Slope #10 (link between Folgarida/Marilleva and Madonna di Campiglio) has been completely restyled. The run is now wider and has an energy-efficient and high-performance snow-making system.

Improved snow-making capabilities

Thanks to a highly efficient snow-production system with over 600 snow generators and further investments in summer 2016, the Funivie Folgarida Marilleva is able to offer visitors a perfect snow base throughout the winter.

Stay in touch – free WiFi

In future, free WiFi will be available at the mountain and base stations of the main lifts and in the parks operated by the Funivie Folgarida Marilleva lift company.

Après-ski and entertainment at Malghet Aut

The Belvedere gondola in Folgarida is now offering an evening service that takes après-ski fun to new heights. Malghet Aut is the new party spot! Music, drinks and an impressive view of the legendary Brenta Dolomites attract crowds to join in the fun at 1,860 m!

New toboggan run in Madonna di Campiglio

From the Monte Spinale, one of the most beautiful spots in the ski resort, the toboggan run takes you over wide expanses down to the Fevri hut at the Spinale 2 chairlift. The chairlift transports you up to the starting point. The toboggan run is almost 3 km long, with an altitude difference of 340 metres.

Improvements in Pinzolo

Optimisation of snow-making capabilities in the areas at the Rododentro and Fossadei slopes and in the beginners’ area. Widening of the Fossadei and Rododentro slopes. Family-oriented service in Prà Rodont and expansion of the “Primi Passi” beginners’ area. Better utilisation of space and creation of a children’s play and toboggan area.

Improvements in Madonna di Campiglio

Expansion of the Zeledria (# 49) and Fiocco di Neve (# 48) slopes in the Pradalago sector. Slope management has been optimised, slopes widened and the snow-production system replaced. Widening of slope 5 Laghi (# 85) at the Pinzolo Campilglio Express mountain station. The snow-production equipment has also been replaced and slope management has been optimised in the final section (merged with the Centenario slope #93). New snow-production equipment on the Graffer slope (# 60) in the Grostè sector. Widening of Spinale Diretta (# 73) for a more comfortable approach to the lift. Increase in transport capacity on the Boch chairlift and new moving carpet entrance at the Genziana chairlift. 50 new high-performance snow generators with low energy consumption.

2014/2015


Vigo


4pers. High speed chairlift (detachable) with bubble

Details here


2013/2014


New Nambino slope

1.2 km with 315 m altitude difference and 100% snow-making capabilities

2012/2013


Pancugolo


4pers. Chairlift (fixed-grip)

Details here


New ski runs and expansion of snow-production equipment

Nambino (intermediate), Pancugolo (intermediate) and Pancugolo (difficult)

2011/2012


Pinzolo-Campiglio Express I


8pers. Gondola lift (monocable circulating ropeway)

Details here


Boch


4pers. High speed chairlift (detachable) with bubble

Details here


Pinzolo-Campiglio Express III


8pers. Gondola lift (monocable circulating ropeway)

Details here


Pinzolo-Campiglio Express II


8pers. Gondola lift (monocable circulating ropeway)

Details here


Madonna di Campiglio-Pinzolo-linking of ski areas

Since the 2011/2012 season, the ski resorts of Madonna di Campiglio-Folgàrida-Marilléva have been linked with Pinzolo to form a single ski area. The new Skiarea Campiglio is now completely interlinked by slopes and lifts.

2010/2011


Grual-Monte Grual


4pers. Chairlift (fixed-grip)

Details here


Tulot-Malga Cioca


8pers. Gondola lift (monocable circulating ropeway)

Details here


Doss della Pesa


4pers. Chairlift (fixed-grip)

Details here


New Dolomitica slope

The slope is 5,750 km long, with an altitude difference of 1,248 metres

New Nube D’Oro difficult slope


2009/2010


Grual-Zapel


4pers. Chairlift (fixed-grip)

Details here


Malga Cioca-Zapel


4pers. Chairlift (fixed-grip)

Details here


2008/2009


2007/2008


5 Laghi


8pers. Gondola lift (monocable circulating ropeway)

Details here


Daolasa 2°


8pers. Gondola lift (monocable circulating ropeway)

Details here


Daolasa 1°


8pers. Gondola lift (monocable circulating ropeway)

Details here


2005/2006


Puza dai Fò-Monte Grual


4pers. High speed chairlift (detachable) with bubble

Details here


Zeledria


4pers. High speed chairlift (detachable)

Details here


Albarè


6pers. Gondola lift (monocable circulating ropeway)

Details here


2004/2005


Grostè


6pers. High speed chairlift (detachable) with bubble

Details here


Spolverino


4pers. High speed chairlift (detachable) with bubble

Details here


2003/2004


Genziana Express


4pers. High speed chairlift (detachable) with bubble

Details here


Orso Bruno


6pers. High speed chairlift (detachable) with bubble

Details here


2002/2003


Panciana


6pers. Gondola lift (monocable circulating ropeway)

Details here


2001/2002


Sghirlat


4pers. High speed chairlift (detachable)

Details here


1999/2000


Malga Grual-Doss del Sabion


4pers. High speed chairlift (detachable)

Details here


Folgarida


6pers. Gondola lift (monocable circulating ropeway)

Details here


1998/1999


Pinzolo-Prà Rodont


6pers. Gondola lift (monocable circulating ropeway)

Details here


Rododendro Express


4pers. High speed chairlift (detachable) with bubble

Details here


Belvedere


6pers. Gondola lift (monocable circulating ropeway)

Details here


Ottava


2pers. Chairlift (fixed-grip)

Details here


1996/1997


Patascoss


4pers. High speed chairlift (detachable) with bubble

Details here


1995/1996


Pradalago


12pers. Gondola lift (monocable circulating ropeway)

Details here


Marilleva


3pers. Chairlift (fixed-grip)

Details here


1992/1993


Spinale Express


12pers. Gondola lift (monocable circulating ropeway)

Details here


1990/1991


1989/1990


Marilleva 900 (Contrè-Malga Copai)


12pers. Gondola lift (monocable circulating ropeway)

Details here


1987/1988


Spinale 2


3pers. Chairlift (fixed-grip)

Details here


1986/1987


Grostè 1


6pers. Gondola lift (monocable circulating ropeway)

Details here


Grostè 2


6pers. Gondola lift (monocable circulating ropeway)

Details here


Mastellina


3pers. Chairlift (fixed-grip)

Details here


1985/1986


Bamby


2pers. Chairlift (fixed-grip)

Details here


1984/1985


Nube d'Argento


2pers. Chairlift (fixed-grip)

Details here


Brenzi


2pers. Chairlift (fixed-grip)

Details here


1981/1982


Miramonti


2pers. Chairlift (fixed-grip)

Details here


Vagliana


2pers. Chairlift (fixed-grip)

Details here


Feedback for the Skiresort.info Team? Please use this form »