New at Madonna di Campiglio/Pinzolo/Folgàrida/Marilleva
Planned project
2024/2025
2023/2024
Gift wrap the SkiArea Campiglio, the best ski experience ever
"A SkiArea Campiglio Dolomiti di Brenta exclusive for the 2023/2024 winter season: StarGift, the open-dated gift card for that special someone that can’t wait for the very first snowfall to finally hit the slopes or to enjoy the best ski experience ever.StarGift includes ski access to the SkiArea Campiglio Dolomiti di Brenta, MyPass Ski service and Helvetia Easy MyPass insurance that provides coverage for claims or injury to third parties which is now mandatory for all snow sports. "
2020/2021
A new jewel in the mountains: the Fortini - Pradalago gondola
The construction of this new 10-passenger lift with a carrying capacity of 3.600 passengers/hour and a speed of 6 meters/second along a 2.432-meter length with an elevation difference of 456 meters, is also the perfect opportunity to renovate both the area surrounding the base station of the lift and the parking area. The base station will be moved to the opposite side of the n. 239 state road, near the lift station that takes skiers up to the Grosté mountain.2019/2020
Nube d'Oro (Malga Montagnoli-Monte Spinale)
6pers. High speed chairlift (detachable) with bubble and seat heating
2018/2019
Widening of slopes and improvement of snow-systems
During summer 2018, the ski area executed several construction works to improve the ski experience:- Pradalago area: Widening of Amazzonia slope (n.57) and implementation of a new snow-making system. New snow-making system on Malga Zeledria-Campo Carlo Magno slope (n.54).
-5-Laghi area: New snow-making system in the first part pf the slope F.I.S.3-Tre.
- Spinale area: Widening of Spinale Diretta slope (n.73) in the track between Montagnoli Lake and the end of the slope served by a new a snow-making system.
2017/2018
2016/2017
Family Park Marilleva
New beginners’ and practice area with a people mover, snow playground and various fun features.Family Park Daolasa
New beginners’ and practice area with several people movers, a playground and various fun features.Restyling of the Malghette slope
Slope #10 (link between Folgarida/Marilleva and Madonna di Campiglio) has been completely restyled. The run is now wider and has an energy-efficient and high-performance snow-making system.Improved snow-making capabilities
Thanks to a highly efficient snow-production system with over 600 snow generators and further investments in summer 2016, the Funivie Folgarida Marilleva is able to offer visitors a perfect snow base throughout the winter.Stay in touch – free WiFi
In future, free WiFi will be available at the mountain and base stations of the main lifts and in the parks operated by the Funivie Folgarida Marilleva lift company.Après-ski and entertainment at Malghet Aut
The Belvedere gondola in Folgarida is now offering an evening service that takes après-ski fun to new heights. Malghet Aut is the new party spot! Music, drinks and an impressive view of the legendary Brenta Dolomites attract crowds to join in the fun at 1,860 m!New toboggan run in Madonna di Campiglio
From the Monte Spinale, one of the most beautiful spots in the ski resort, the toboggan run takes you over wide expanses down to the Fevri hut at the Spinale 2 chairlift. The chairlift transports you up to the starting point. The toboggan run is almost 3 km long, with an altitude difference of 340 metres.Improvements in Pinzolo
Optimisation of snow-making capabilities in the areas at the Rododentro and Fossadei slopes and in the beginners’ area. Widening of the Fossadei and Rododentro slopes. Family-oriented service in Prà Rodont and expansion of the “Primi Passi” beginners’ area. Better utilisation of space and creation of a children’s play and toboggan area.Improvements in Madonna di Campiglio
Expansion of the Zeledria (# 49) and Fiocco di Neve (# 48) slopes in the Pradalago sector. Slope management has been optimised, slopes widened and the snow-production system replaced. Widening of slope 5 Laghi (# 85) at the Pinzolo Campilglio Express mountain station. The snow-production equipment has also been replaced and slope management has been optimised in the final section (merged with the Centenario slope #93). New snow-production equipment on the Graffer slope (# 60) in the Grostè sector. Widening of Spinale Diretta (# 73) for a more comfortable approach to the lift. Increase in transport capacity on the Boch chairlift and new moving carpet entrance at the Genziana chairlift. 50 new high-performance snow generators with low energy consumption.2014/2015
2013/2014
New Nambino slope
1.2 km with 315 m altitude difference and 100% snow-making capabilities2012/2013
New ski runs and expansion of snow-production equipment
Nambino (intermediate), Pancugolo (intermediate) and Pancugolo (difficult)2011/2012
Madonna di Campiglio-Pinzolo-linking of ski areas
Since the 2011/2012 season, the ski resorts of Madonna di Campiglio-Folgàrida-Marilléva have been linked with Pinzolo to form a single ski area. The new Skiarea Campiglio is now completely interlinked by slopes and lifts.2010/2011
New Nube D’Oro difficult slope
2009/2010
2008/2009
2007/2008
2005/2006
2004/2005
2003/2004
2002/2003
2001/2002
1999/2000
1998/1999
1996/1997
1995/1996
1992/1993
1990/1991
1989/1990
Marilleva 900 (Contrè-Malga Copai)
1987/1988
1986/1987
1985/1986
1984/1985
1981/1982
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
Test Reports