Ski resorts Italy
Number of ski lifts |
|
Total capacity | 5180 Passengers/hour |
Total lift length | 6.4 km Total |
Directly to:
Other types of ascension mechanisms
Towns/villages at the ski resort (distance from town center):
Malcesine (0.5 km), San Valentino di Brentonico (11 km) Towns/villages at the ski resort more
Malcesine (0.5 km), San Valentino di Brentonico (11 km) Towns/villages at the ski resort more
List of all current ski lifts
80pers. Aerial tramway/Reversible ropeway
Length: 2813 m
Carrying capacity/hour: 600
Manufacturer: Doppelmayr
45pers. Aerial tramway/Reversible ropeway
Length: 1512 m
Carrying capacity/hour: 600
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 1025 m
Carrying capacity/hour: 1800
Manufacturer: LEITNER
J-bar
Length: 422 m
Carrying capacity/hour: 720
Manufacturer: Graffer
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
Test Reports
Tips for the ski holiday