Ski resorts Ural Federal District
Number of ski lifts |
|
Total capacity | 5407 Passengers/hour |
Total lift length | 3.7 km Total |
Directly to:
Planned ski lifts
4pers. High speed chairlift (detachable)
Length: 2500 m
Carrying capacity/hour: 2010
List of all current ski lifts
6pers. High speed chairlift (detachable) with bubble
Length: 2181 m
Carrying capacity/hour: 3085
Manufacturer: Doppelmayr
2pers. Chairlift (fixed-grip)
Length: 725 m
Carrying capacity/hour: 910
Manufacturer: Doppelmayr
T-bar
Length: 624 m
Carrying capacity/hour: 912
Manufacturer: Doppelmayr
Rope tow/baby lift with low rope tow
Length: 200 m
Carrying capacity/hour: 500
Feedback for the Skiresort.info Team? Please use this form »
Book this ski resort
Test Reports
Tips for the ski holiday